Starter
- Price
- Free, no card
- For
- One person, with up to 5 active projects and 2 AI reviews a month
Includes
- Everything in Standard, with no time limit.
Stralos is estimating software for civil contractors. It follows a job the way you price one: measure it off the drawing or the aerial, price it with your own labour, plant and supplier rates, check it against the tender documents and drawings, and send the client’s schedule back priced. One page for each part.
Numbers on this page come from an example job, Riverbend Stage 3, and an example company.
Get the quantities off the drawing, the aerial or the dig, and keep them tied to the price.
Load a PDF drawing set and Stralos stitches the plan sheets into one whole-site drawing, so a run across match lines is one measurement. Take off lengths, areas, counts and tagged runs, with the scale read from the sheet and checked, and each quantity drives the item it’s linked to: 219.50 m taken off against the 220 m the schedule gives for 3.01.
No drawings yet? Measure on LINZ aerial or Google Maps satellite imagery with no scale to set, with LINZ property boundaries on. Turn on council stormwater, wastewater and drinking water pipes from more than 25 councils and water providers, click a pipe for what the council records, such as material, and diameter where they publish one, and save it as a measurement.
Three waters only, and not nationwide: Auckland is water and wastewater, and Dunedin and Invercargill city aren’t in it. The full council list is on the page.
Aerial imagery and property boundaries: Toitū Te Whenua LINZ, CC BY 4.0. Pipe data: Canterbury Maps and partners, CC BY 4.0.
Material and structure calculators linked to your takeoff and pricing: Trench, Pit / Structures and Volume today, with more being added. Each takes its length or area from your takeoff and sends each layer, in m³ and tonnes, to the item’s price. On Riverbend a 180 m trench, 0.75 m wide and averaging 1.05 m deep from subgrade, is 141.75 m³ in the ground and 163.01 m³ loose, and you can turn it in 3D.
Turn quantities into rates built from your own labour, plant and supplier costs, not a number you typed last year.
Work out each rate from your own crews, plant, materials, subcontractors and disposal, then set the production rate in the unit the work is priced in. At a production rate of 30 m a day, 220 m of DN300 takes 7.33 days and costs NZ$397.69 a metre, and the Trail shows each step from the measurement to the price.
Import a supplier’s price list from Excel, CSV or PDF and confirm each match. Stralos ranks the suppliers and subcontractors you’ve loaded by road distance and fills each line from the supplier you prefer, or the cheapest within the Search distance you set, with cartage as its own line. On a Tender job it also lists up to ten of your closest quarry supplier sites, with drive time shown.
Bring in the client’s schedule of quantities from Excel, PDF or Word with their numbering kept exactly, so 3.01 stays 3.01, then lock it. Your measured quantity sits beside theirs, which is how 3.07 shows 201 m scheduled against 223.7 m measured.
Find what’s missing while you can still price it, then send it back the way the client asked for it. These two are on Standard.
Choose up to 60 tender documents and drawings and the review looks for scope that isn’t priced, prices that look wrong, risky clauses and conditions, and quantities that don’t match your takeoff, usually in 2 to 5 minutes. Findings from the documents quote the page they came from, and a scope gap whose quote can’t be confirmed is dropped.
Ready to submit lists what’s still open, then the tender downloads as a branded PDF, Word or Excel file. The client’s own workbook goes back with your rates written in, nothing retyped: 3.01 at NZ$439.96 a metre, NZ$96,791.20.
For the jobs that aren’t tenders, and for a second pair of hands on the ones that are.
Not every job is a tender: price a quick quote from your own crew, plant and material costs, with each part of the job a line your client reads. Add agreed day rates with no markup, run the quote review, and send a PDF or a private link.
Includes
Includes
Includes
Not on Lite: tender jobs, the client’s schedule of quantities, Tender review and the client’s workbook.
Yearly is charged in full the day you choose it. Standard has no paid add-ons.
Free on Starter: everything in Standard for one person, with up to 5 active projects and 2 AI reviews a month. No card. When you add people or go past 5 active projects, Standard is NZ$199 per user per month + GST. Lite, for quotes, is NZ$99 + GST.
Ask us and we’ll load your price list into your rate library for you.
Checking sign-ups…
Thanks, we’ll email you when sign-ups open.
You’re on Starter: free for one person, with up to 5 active projects and 2 AI reviews a month.
Setting up your workspace…
This usually takes under two minutes, and we’ll take you straight in when it’s ready. If you close this page, nothing is lost: we’ll email you a link to sign in.