Subdivision civil works estimating software: price the whole stage, and catch the short schedule
Stralos is estimating software for civil contractors pricing subdivision stages for developers: preliminary and general, earthworks, stormwater, wastewater, water supply and roading in one tender. Bring in the engineer’s schedule with its numbering kept, measure the drawings to check their quantities, build every rate from your own crews and suppliers, and send their workbook back priced.
Free on Starter: everything in Standard for one person, with up to 5 active projects and 2 AI reviews a month. No card. When you add people or go past 5 active projects, Standard is NZ$199 per user per month + GST. Lite, for quotes, is NZ$99 + GST.
What makes a subdivision stage hard to price?
-
The quantities are the engineer’s. The price is yours.
Riverbend’s schedule calls its quantities an estimate for tender evaluation only and wants errors raised “before questions close”. That’s measure and value, clause 2.3 of NZS 3910:2023. On a lump sum, clause 2.2, check who carries a short quantity before you price it.
-
Six trades, one closing date.
A 28-lot stage is 50 lines, from preliminary and general to roading, in m², m³, m, No, LS, PS, % and day. The detail sits in the council’s own code: Queenstown Lakes’, for one, is NZS 4404:2010 reproduced with council amendments.
-
Sign-off hides in two lump sums.
Item 1.06 is the as-built survey, asset data and PS3. Item 1.07 is every test, from CCTV of all gravity pipelines to Benkelman beam. The developer can’t deposit the survey plan until the council certifies the consent conditions are met, or otherwise covered, under section 224(c) of the Resource Management Act 1991.
-
The special conditions carry cost the schedule never mentions.
NZS 3910:2023 set out to lessen the need for special conditions. Developers still write them. Riverbend’s SC 14 wants 1.8 m mesh fencing around three trees before any other site work, and there’s no schedule item for it.
One job, priced in Stralos: Riverbend Stage 3, 28 lots
Example job and company: Riverbend Stage 3, 28 lots in Selwyn District for Kahu Plains Land Ltd, priced by the fictional Kesterton Civil Ltd under NZS 3910:2023, measure and value.
-
The pack lands.
Drop in the schedule, the drawings and the special conditions. Stralos suggests all 50 lines in their seven sections, with the client’s numbering kept. Accept them and the estimate schedule locks to theirs. (On Standard, and free on Starter.)
Recorded in Stralos: the tender pack goes in, the client’s schedule is suggested, and 3.01 stays 3.01. Example job. -
Check their quantities.
Take off the DN300 mains on the stormwater plan: 219.50 m against 220 m scheduled. Then the lot connections in item 3.07: 201 m scheduled, 223.7 m measured. Each of the 23 connections runs 1.0 m inside the lot and the schedule stops at the boundary: 23 m, or 22.7 m after their rounding. On measure and value you’re paid for it, so the tender sum reads about NZ$5,700 low. On a lump sum it’s yours. Either way, query it.
Recorded in Stralos: the DN300 runs taken off on the drawing, 219.50 m against 220 m scheduled. Example job. -
Earthworks by area and depth.
Item 2.01, strip topsoil: 5,440 m² at 0.25 m in the Volume calculator is 1,360 m³. Earthworks go in as areas and depths, and here the area is typed from the schedule.
The Volume calculator: 2.01 topsoil strip, 5,440 m² at 0.25 m deep, 1,360 m³. Example job. -
Mains, laterals and the connection.
Each trench takes its length from the takeoff: 180 m of DN300 under the carriageway, 0.75 m wide and averaging 1.05 m deep from subgrade, is 141.75 m³ of dig. At a production rate of 30 m a day, item 3.01 costs NZ$397.69 a metre and goes in at NZ$439.96. On a map sheet, the council’s pipe records show the main the stage connects to: three waters from more than 25 councils and water providers, not nationwide.
Recorded in Stralos: a lateral trench in the lots, with topsoil and gravel reused, the surplus carted, then the trench in 3D. Example job.
Recorded in Stralos: the production rate changes from 25 to 30 m a day, and the days, hours and cost per metre follow. Example job and rates. -
Price the time, review, then send their workbook back.
Preliminary and general is mostly time: site management and traffic management are built up by the week for as long as the stage is on site, and testing is priced line by line. Then Tender review reads the documents you choose. Findings from the documents quote the page they came from: here, tree protection under SC 14, page 4 of the special conditions, with nothing priced for it. Last, the client’s own workbook goes back priced.
Recorded in Stralos: the tender review’s findings, then the SC 14 citation opening the special conditions at the clause. Example job.
Recorded in Stralos: Ready to submit, the downloads, then the client’s own workbook with section 3 priced. Example job and rates. -
Then plan it.
The tender programme draws each bar from the crew’s production rate and rounds it up to whole working days: the DN375 and DN300 mains are 2.6 and 7.33 days of work, drawn as 3-day and 8-day bars. It gives durations, not a sequence: you add the links.
Recorded in Stralos: the tender programme with bars from the crews’ production rates. Example job. Programme and the scheduler are being released to all companies shortly.
What you start with
Sign up as “Civil contractor” and your rate library starts with 41 categories: Pipes & Ducts, Pits & Chambers, Aggregates & Fill, Traffic Management, Testing & Commissioning and Surveying & Set-out among them. It holds your own rates and your suppliers’ price lists. Ask us and we’ll load your price list into your rate library for you.
Questions
Can it price a whole subdivision stage, not just the drainage?
Yes. Every section sits in one estimate schedule. Trenches, pits and volumes have calculators. Everything else is measured in takeoff and priced from your own costs.
Does it work for lump sum tenders?
It prices the same way. Your measured quantity shows beside the scheduled one with the variance, and you choose which to price. Whether a short quantity is your risk depends on your documents.
Does it handle provisional sums and rate-only items?
Yes. Provisional sums, rate-only items and percentage items are item types on the estimate schedule. A rate-only item stays out of the total.
Can I send the price back in the developer’s own spreadsheet?
Yes. Export original workbook writes your rates and amounts into their Excel file with the numbering untouched. A row it wasn’t sure of is listed on a Please check sheet.